Tuesday, January 6, 2015

Onward....

 

After a trip to a local hardwood supplier, daddy dave picked up a load of oak flooring for the latest project, It was quiet a load.

Once the flooring was stacked in the house(to aclamate), the old flooring in the rooms which needed new flooring was removed.

Once the floors were bare....

Then a moisture barrier was put down and measurements made and the first couple rows of flooring was laid(via help from uncle Nate, thanks).

This was slow going being the flooring was small pecies.....

But the largest of the rooms in need is almost done minus the closet.