Work on the laundry room must go on...........here the laundry room is emptied and the floor is to be prepped for hardwood.
First the concrete was treated with a water proofing.....
Then a second moisture/adhesive/sound barrier was applied and the wood installed....
After the proper dry time, the floor imperfections were filled......
Than the floor was sanded........
And the first coat of top coat was applied...........to be continued
2 comments:
Pretty nice
nice things are afoot.
Post a Comment