Well with another occasion come and gone it was time to put my nose back to the grind stone. With a couple free days without having to work on the rental it was back to the laundry room. First I had to secure the framing to the concrete floor, this was done with some concrete nuts and bolts.
Then on to that pesky draft, there is a small gap in between the exterior siding and the concrete slab.
With some well placed scrap 2x4's any openings/access were blocked.
Here we have a load of insulation or what I like to call itch-sulation.
Now the wall insulation was in place .
There was a notacable differance in the temperature in the newly insulated laundry room, now on to the attic.
With no previous insulation in the attic this was much needed, it was no fun installing but was needed.
After the attic access was framed out and a access door installed, next thing is to hook this room into main house hvac system another job in itself but that's for another day.