then concrete blocks were leveled and placed to provided a resting place for the risers and keep them off the ground, then the risers were attached to the ledge.
Next the steps were attached with a little notching done to make way for the hand railing.
Last the railing was attached with more additional notching being done for a custom look. I am not the notch master as is my father(grandpa anderson cuts notches like Lincoln logs, notching everything. of course this does make for a custom and stronger product). But here is the finish product built with safety in mind.
1 comment:
Notch a bad job.
Post a Comment